The NEW BEDFORD HOUSING AUTHORITY, the Awarding Authority, invites sealed bids from Contractors for the Dusk to Dawn Lighting Upgrades Phase 1 – Dottin Place at Dottin Place I in New Bedford, Massachusetts, in accordance with the documents prepared by LIRO-HILL CORP.
The Project consists of but not limited to:
Exterior lighting upgrades to the existing residential units, including the following: replacing the front and rear porch sconces at each unit with new LED sconces having integral photocell control, and covering all interior porch light switches so the porch lighting is controlled solely by the integral photocells. All fixtures are to be wet-location rated per the project drawings.
The work is estimated to cost $153,212.00.
All bidding Requests for Information (RFIs) shall be submitted online by 07/17/2026 at 2:00PM EDT for general bids.
Bids are subject to M.G.L. c.149 §44A-J & to minimum wage rates as required by
M.G.L. c.149 §§26 to 27H inclusive.
THIS PROJECT IS BEING ELECTRONICALLY BID AND HARD COPY BIDS WILL
NOT BE ACCEPTED. Please review the instructions in the bid documents on how to register as an electronic bidder. All Bids shall be submitted online at www.biddocs.com and received no later than the date and time specified.
General bidders must be certified by the Division of Capital Asset Management and Maintenance (DCAMM) in the following category of work, Electrical, and must submit a current DCAMM Certificate of Eligibility and signed DCAMM Prime/General
Contractor Update Statement.
General Bids will be received until 23 July 2026 at 2:00PM EDT and publicly opened online, forthwith.
General bids and sub-bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (including all alternates), and made payable to
the NEW BEDFORD HOUSING AUTHORITY. Note: A bid deposit is not required for Projects advertised under $50,000.
Bid Forms and Contract Documents will be available for review at www.biddocs.com (may be viewed and downloaded electronically at no cost).
PRE-BID CONFERENCE / SITE VISIT: Scheduled
Date and Time: 07/15/2026 at 11:00AM EDT Address: 8 Amanda Avenue, New Bedford, MA 02745 Instructions: None
The hard copy Contract Documents may be seen at: Nashoba Blue Inc.
433 Main Street
Hudson, MA 01749
978-568-1167
Contract ID#: NBHA # 007-2026 Dottin 1 Dusk to Dawn Lighting Upgrades Phase 1
Date Contract added: 07/08/26 8:00 AM
Closing Bid Deadline: 07/23/26 2:00 PM
Contract Status: Open
If your company intends on submitting a bid, please click the button below.
The New Bedford Housing Authority cannot track vendors, bidders, or proposers who download an IFB or RFP therefore all bidders, vendors and proposers who download an IFB or RFP are responsible for checking the website periodically for any addenda to the IFB or RFP issued by the New Bedford Housing Authority. Addendums could be issued up to 48 hours before the bid closing.
Addendums (2)
-
07/17/26 - ADDENDUM NO. 2 07/14/2026
BID DOCUMENT MODIFICATIONS ARE AS FOLLOWS. Specifications: ■ Delete the following technical sections in their entirety. 02 28 20 Asbestos Remediation All other of the portions of the Contract Documents remain unchanged. Please be reminded to acknowledge this Addendum on the bid forms. -
07/17/26 - ADDENDUM NO. 1 07/14/2026
BID DOCUMENT MODIFICATIONS ARE AS FOLLOWS. Supplemental Bid Forms: Add the following supplemental bid forms. 00 73 39.01 - NBHA Section 3 Plan (2026) ATTACHMENT B (Submit By General Contractor) 00 73 39.02 - NBHA Section 3 Plan (2026) ATTACHMENT E (Submit By General Contractor) 00 73 73.4 - Labor Harmony & OSHA Training Cert (Submit By General Contractor) Delete the following supplemental bid forms. 00 22 13.1 - Instructions to Bidders for Contracts (HUD 5369) 00 73 39.0 - NBHA Section 3 Plan (2026) Specifications: ■ Delete the following technical sections in their entirety. 00 72 00 HUD 5370 General Conditions (Greater than $250K) ■ Add the following new technical sections. (See attached) 00 10 00 Table of Contents 00 72 00.01 HUD 5370EZ General Conditions (Greater than $2K Less than $250K) 00 73 39.01 NBHA Section 3 Plan (2026) ATTACHMENT B 00 73 39.02 NBHA Section 3 Plan (2026) ATTACHMENT E ■ Replace the following technical sections in their entirety. (See attached) 00 22 13.3 Notice to Bidders 00 73 43.10 Wage Rates All other of the portions of the Contract Documents remain unchanged. Please be reminded to acknowledge this Addendum on the bid forms.
Questions & Answers
If you have any questions about this contract please email us at nbha.website@newbedfordhousingauthority.org - all questions and corresponding answers will be added below.None yet
